
1009, Collective 2.0 Tower B
Sold prices and rental history: sold once, by the developer in January 2020, and rented continuously since 2022. Every registered sale and contract is below; today's estimate is free after a one-time verification.
Property timeline for 1009, Collective 2.0 Tower B
What is 1009 worth today?
Unlock today's estimate, updated daily, with
Verify once to see valuations for every property. Everything else on this page is open.
Source: Dubai Land Department. Updated 22 July 2026.
Key facts
- Type
- 1-bed apartment
- Size
- 486 sqft
- Floor
- 10th of 18
- Parking
- B-245
- Developer
- Dubai Hills Estate
- Completed
- 2022
- Service charge
- AED 1,300 /yr
- Last sold
- AED 710K · January 2020
- Building
- Collective 2.0 Tower B
About 1009, Collective 2.0 Tower B
1009 is a one-bedroom apartment of 486 sqft on the 10th floor of Collective 2.0 Tower B, a 18-storey tower in Dubai Hills Estate completed in 2022 by Dubai Hills Estate. The developer sold it on 7 January 2020 for AED 709,888, or AED 1,460 per sqft, in line with the AED 1,474 one-beds in the building were fetching at the time.
It has been rented continuously since 2022 on 6 Ejari contracts. The current contract, signed on 22 July 2026, is AED 65,000 a year: a gross yield of 9.2% on the 2020 price, before the service charge of about AED 1,300 a year.
Sales and rents for 1009 over time
1009 has sold once; the dashed line is the one-bed median of each year in the building.
Annual rent on each registered contract; the dashed line is the one-bed median of each year in the building.
1-beds in Collective 2.0 Tower B, and where 1009 sits
All 142 1-beds →1009 last sold in January 2020 at AED 1,460 per sqft, in line with what one-beds in Collective 2.0 Tower B were fetching at the time (AED 1,474). Over the last 12 months one-beds sold for AED 1,000,000 to 1,250,000, around AED 2,423 per sqft, and rent for AED 63,250 to 170,000 a year. 1009's AED 65,000 is in the lower half of that range.
| Recent 1-bed sales | Unit no. | Size | Price (AED) | Per sqft | Summary |
|---|---|---|---|---|---|
| 12 Aug 202612 August 2026 | 478 sqft | 36,228 | 75 | ||
| 10 Aug 202610 August 2026 | 486 sqft | 50,767 | 104 | ||
| 16 Jul 202616 July 2026 | 477 sqft | 1,125,000 | 2,356 | ||
| 16 Jun 202616 June 2026 | 496 sqft | 1,060,000 | 2,138 |
Collective 2.0 Tower B
Building270 apartments, 1-bed to 2-bed over 18 floors in Dubai Hills Estate, completed in 2022 by Dubai Hills Estate. 21 sold in the last 12 months.
- Typical price per sqft
- AED 2,423 Down 1.9%
- Typical sale
- AED 1.51M
- Typical rent
- AED 88K /yr
- Typical yield
- 6.5%
Other units on the 10th floor
All 270 units in Collective 2.0 Tower B| ValueToday's value | |||||
|---|---|---|---|---|---|
| 1001 | 2-bed | 732 sqft | AED 1.1MAED 1,103,888 · Nov 2019November 2019 | ||
| 1002 | 2-bed | 723 sqft | AED 1.08MAED 1,075,888 · Jan 2019January 2019 | 100,000 /yr | |
| 1003 | 2-bed | 722 sqft | AED 1.15MAED 1,150,000 · Jul 2022July 2022 | 110,000 /yr | |
| 1004 | 1-bed | 490 sqft | AED 1.28MAED 1,275,000 · Nov 2025November 2025 | 90,000 /yr | |
| 1005 | 2-bed | 742 sqft | AED 1.65MAED 1,650,000 · Mar 2024March 2024 | 130,000 /yr | |
| 1006 | 2-bed | 725 sqft | AED 1.77MAED 1,770,000 · Nov 2024November 2024 | 115,000 /yr | |
| 1007 | 1-bed | 477 sqft | AED 700KAED 699,888 · Aug 2019August 2019 | 70,000 /yr | |
| 1008 | 1-bed | 478 sqft | AED 700KAED 699,888 · Dec 2019December 2019 | 65,000 /yr | |
| 1010 | 2-bed | 736 sqft | AED 2MAED 2,000,000 · Jun 2026June 2026 | 125,823 /yr | |
| 1011 | 1-bed | 482 sqft | AED 716KAED 715,888 · Jun 2019June 2019 | 95,000 /yr | |
| 1012 | 1-bed | 496 sqft | AED 915KAED 915,000 · Jan 2023January 2023 | 83,000 /yr | |
| 1013 | 1-bed | 486 sqft | AED 716KAED 715,888 · Aug 2019August 2019 | 68,000 /yr | |
| 1014 | 2-bed | 741 sqft | AED 1.05MAED 1,053,888 · Mar 2019March 2019 | 90,000 /yr | |
| 1015 | 2-bed | 727 sqft | AED 1.78MAED 1,780,000 · Jan 2025January 2025 | ||
| 1016 | 1-bed | 474 sqft | AED 1.23MAED 1,225,000 · Sep 2023September 2023 | ||
| 1017 | 1-bed | 486 sqft | AED 1.25MAED 1,250,000 · Dec 2025December 2025 | 82,000 /yr |
1009, Collective 2.0 Tower B in numbers
- Sold once: by Dubai Hills Estate on 7 January 2020 for AED 709,888, or AED 1,460 per sqft.
- Rented since September 2022 on 6 Ejari contracts, from AED 54,000 to AED 65,000 a year.
- At AED 65,000 a year the gross yield on the 2020 price is 9.2%, before a service charge of about AED 1,300 a year (AED 2.70 per sqft).
- One-beds in Collective 2.0 Tower B sold for AED 1,000,000–1,250,000 in the 12 months to November 2026; the building's median across all types is AED 2,423 per sqft.
Source: Dubai Land Department. Updated 22 July 2026.
Questions about 1009, Collective 2.0 Tower B
What did unit 1009 last sell for?
AED 709,888 on 7 January 2020, sold by the developer: AED 1,460 per sqft for 486 sqft. It is the only registered sale of the unit.
What is the rent for unit 1009?
AED 65,000 a year on the contract signed on 22 July 2026. The previous contract, from November 2025, was AED 82,000; the unit has been rented since September 2022.
How big is unit 1009?
486 sqft (45.2 sqm): a one-bedroom apartment on the 10th floor of a 18-storey tower completed in 2022.
What is unit 1009 worth today?
The YallaValue estimate is updated daily and free after a one-time verification by WhatsApp, email or Google. One-beds in Collective 2.0 Tower B sold for AED 1,000,000 to 1,250,000 in the last 12 months, around AED 2,423 per sqft.
Selling 1009? Put it on the OpenOffers board
Public offers from verified, deposit-backed buyers; a reserve you set; no fee unless it sells, then 1%. Sale agreed in weeks, not months.
Mortgage on 1009, Collective 2.0 Tower B
Starts from the last sale price (AED 710K, 7 January 2020). Switch to today's estimate once you have unlocked it.- Price
- AED 709,888
- Deposit, UAE resident (20%)
- AED 141,978
- Deposit, non-resident (40%)
- AED 283,955
- Monthly over 25 years at 3.7%
- AED 2,904
Plus the 4% Dubai Land Department transfer fee and about AED 5,000 of registration and trustee costs. Full mortgage calculator →