
A116, Celestia A
Sold prices and rental history: sold twice, last in February 2026, and rented continuously since 2022. Every registered sale and contract is below; today's estimate is free after a one-time verification.
Property timeline for A116, Celestia A
What is A116 worth today?
Unlock today's estimate, updated daily, with
Verify once to see valuations for every property. Everything else on this page is open.
Source: Dubai Land Department. Updated 26 February 2026.
Key facts
- Type
- 2-bed apartment
- Size
- 1,110 sqft
- Floor
- 1st of 7
- Parking
- B2-037
- Developer
- DAMAC
- Completed
- 2019
- Service charge
- AED 16,000 /yr
- Last sold
- AED 1.2M · February 2026
- Building
- Celestia A
About A116, Celestia A
A116 is a two-bedroom apartment of 1,110 sqft on the 1st floor of Celestia A, a 7-storey tower in Dubai South completed in 2019 by DAMAC. It last sold on 26 February 2026 for AED 1,200,000, or AED 1,080 per sqft, in line with the AED 1,057 two-beds in the building were fetching at the time.
It has been rented continuously since 2022 on 6 Ejari contracts. The current contract, signed on 5 September 2025, is AED 76,000 a year: a gross yield of 6.3% on the 2026 price, before the service charge of about AED 16,000 a year.
Sales and rents for A116 over time
A116 has sold twice; the dashed line is the two-bed median of each year in the building.
Annual rent on each registered contract; the dashed line is the two-bed median of each year in the building.
2-beds in Celestia A, and where A116 sits
All 30 2-beds →A116 last sold in February 2026 at AED 1,080 per sqft, in line with what two-beds in Celestia A were fetching at the time (AED 1,057). Over the last 12 months two-beds sold for AED 1,000,000 to 1,210,000, around AED 1,062 per sqft, and rent for AED 59,000 to 92,000 a year. A116's AED 76,000 is in the upper half of that range.
| Recent 2-bed sales | Unit no. | Size | Price (AED) | Per sqft | Summary |
|---|---|---|---|---|---|
| 15 Aug 202615 August 2026 | 1,111 sqft | 1,200,000 | 1,080 | ||
| 16 Apr 202616 April 2026 | 1,120 sqft | 1,170,000 | 1,044 | ||
| 30 Mar 202630 March 2026 | 1,111 sqft | 1,000,000 | 899 | ||
| 6 Jan 20266 January 2026 | 1,120 sqft | 1,150,000 | 1,026 |
Celestia A
Building504 apartments, studios to 2-bed over 7 floors in Dubai South, completed in 2019 by DAMAC. 49 sold in the last 12 months.
- Typical price per sqft
- AED 1,111 Up 4.1%
- Typical sale
- AED 530K
- Typical rent
- AED 42K /yr
- Typical yield
- 7.8%
Other units on the 1st floor
All 504 units in Celestia A| ValueToday's value | |||||
|---|---|---|---|---|---|
| A101 | 2-bed | 1,122 sqft | AED 749KAED 749,000 · May 2019May 2019 | 76,000 /yr | |
| A102 | 2-bed | 1,120 sqft | AED 770KAED 770,000 · Nov 2023November 2023 | 78,500 /yr | |
| A103 | Studio | 448 sqft | AED 380KAED 380,000 · Jul 2025July 2025 | 48,000 /yr | |
| A104 | Studio | 450 sqft | AED 720KAED 720,100 · Nov 2014November 2014 | 33,275 /yr | |
| A105 | Studio | 448 sqft | AED 310KAED 310,000 · Dec 2022December 2022 | 41,000 /yr | |
| A106 | Studio | 449 sqft | AED 321KAED 321,300 · Mar 2022March 2022 | 41,000 /yr | |
| A107 | Studio | 449 sqft | AED 470KAED 470,000 · Nov 2024November 2024 | 40,000 /yr | |
| A108 | Studio | 449 sqft | AED 445KAED 445,000 · Nov 2024November 2024 | 40,000 /yr | |
| A109 | Studio | 449 sqft | AED 535KAED 535,000 · Mar 2026March 2026 | 40,000 /yr | |
| A110 | Studio | 449 sqft | AED 669KAED 669,200 · Oct 2014October 2014 | 42,000 /yr | |
| A111 | Studio | 447 sqft | AED 535KAED 535,000 · Jul 2025July 2025 | 37,000 /yr | |
| A112 | Studio | 446 sqft | AED 313KAED 313,000 · Dec 2022December 2022 | 40,000 /yr | |
| A113 | Studio | 450 sqft | AED 676KAED 676,200 · Feb 2015February 2015 | 38,000 /yr | |
| A114 | Studio | 444 sqft | AED 520KAED 520,000 · Sep 2026September 2026 | 40,000 /yr | |
| A115 | 2-bed | 1,111 sqft | AED 1MAED 1,000,000 · Mar 2026March 2026 | 80,000 /yr | |
| A117 | Studio | 444 sqft | AED 681KAED 681,096 · Nov 2014November 2014 | 43,000 /yr | |
| A118 | Studio | 446 sqft | AED 673KAED 673,400 · Dec 2014December 2014 | 26,500 /yr | |
| A119 | 1-bed | 817 sqft | AED 491KAED 491,000 · Apr 2022April 2022 | 60,000 /yr | |
| A120 | Studio | 440 sqft | AED 677KAED 676,848 · Dec 2014December 2014 | 42,000 /yr | |
| A121 | Studio | 441 sqft | AED 575KAED 575,000 · Jul 2025July 2025 | 47,000 /yr | |
| A122 | Studio | 448 sqft | AED 495KAED 495,000 · Sep 2024September 2024 | 42,000 /yr | |
| A123 | Studio | 447 sqft | AED 686KAED 686,000 · Sep 2014September 2014 | 36,000 /yr | |
| A124 | Studio | 446 sqft | AED 683KAED 683,200 · Sep 2014September 2014 | 35,000 /yr | |
| A125 | 1-bed | 968 sqft | AED 639KAED 639,000 · Apr 2023April 2023 | 60,000 /yr | |
| A126 | 1-bed | 979 sqft | AED 1.42MAED 1,423,100 · Feb 2015February 2015 | 55,000 /yr | |
| A127 | Studio | 446 sqft | AED 465KAED 465,000 · Feb 2025February 2025 | 40,000 /yr | |
| A128 | Studio | 445 sqft | AED 349KAED 349,200 · Dec 2024December 2024 | 43,000 /yr | |
| A129 | Studio | 454 sqft | AED 716KAED 716,300 · Nov 2014November 2014 | 40,000 /yr | |
| A130 | Studio | 448 sqft | AED 304KAED 304,000 · May 2023May 2023 | 40,000 /yr | |
| A131 | Studio | 440 sqft | AED 299KAED 299,000 · May 2023May 2023 | 38,000 /yr | |
| A132 | Studio | 439 sqft | AED 495KAED 495,000 · Oct 2025October 2025 | 43,000 /yr | |
| A133 | 1-bed | 832 sqft | AED 550KAED 549,999 · Nov 2019November 2019 | 60,000 /yr | |
| A134 | 1-bed | 834 sqft | AED 900KAED 900,000 · Sep 2024September 2024 | ||
| A135 | Studio | 440 sqft | AED 762KAED 761,900 · Aug 2015August 2015 | 27,500 /yr | |
| A136 | Studio | 441 sqft | AED 345KAED 344,960 · Dec 2021December 2021 | ||
| A137 | Studio | 448 sqft | AED 590KAED 590,100 · May 2018May 2018 | 37,000 /yr | |
| A138 | Studio | 447 sqft | AED 309KAED 309,000 · Apr 2022April 2022 | 42,000 /yr | |
| A139 | Studio | 443 sqft | AED 683KAED 682,512 · Dec 2014December 2014 | 43,050 /yr | |
| A140 | 1-bed | 895 sqft | AED 600KAED 599,999 · Sep 2019September 2019 | 57,750 /yr | |
| A141 | 1-bed | 894 sqft | AED 610KAED 609,999 · Mar 2020March 2020 | 60,000 /yr | |
| A142 | Studio | 436 sqft | AED 560KAED 560,000 · Oct 2025October 2025 | 41,000 /yr | |
| A143 | Studio | 446 sqft | AED 683KAED 682,512 · Nov 2014November 2014 | 45,000 /yr | |
| A144 | Studio | 454 sqft | AED 345KAED 345,000 · Jun 2022June 2022 | ||
| A145 | Studio | 448 sqft | AED 525KAED 525,000 · Jan 2026January 2026 | 40,000 /yr | |
| A146 | Studio | 440 sqft | AED 510KAED 510,000 · Apr 2025April 2025 | 37,000 /yr | |
| A147 | Studio | 439 sqft | AED 716KAED 715,500 · Nov 2014November 2014 | 40,000 /yr | |
| A149 | 1-bed | 785 sqft | AED 485KAED 485,000 · Jun 2023June 2023 | 55,000 /yr | |
| A150 | Studio | 440 sqft | AED 445KAED 445,000 · Oct 2026October 2026 | 30,450 /yr | |
| A151 | Studio | 441 sqft | AED 677KAED 676,848 · Aug 2015August 2015 | ||
| A152 | Studio | 448 sqft | AED 717KAED 717,250 · Nov 2014November 2014 | 40,000 /yr | |
| A153 | Studio | 447 sqft | AED 735KAED 735,300 · Dec 2014December 2014 | 40,000 /yr | |
| A154 | Studio | 449 sqft | AED 771KAED 771,400 · Feb 2015February 2015 | 33,000 /yr | |
| A155 | 1-bed | 979 sqft | AED 590KAED 590,000 · Feb 2024February 2024 | 64,000 /yr | |
| A156 | 1-bed | 972 sqft | AED 618KAED 618,000 · Nov 2022November 2022 | 58,000 /yr | |
| A157 | Studio | 439 sqft | AED 666KAED 666,400 · Sep 2014September 2014 | 46,000 /yr | |
| A158 | Studio | 446 sqft | AED 515KAED 515,000 · Aug 2025August 2025 | 42,000 /yr | |
| A159 | Studio | 454 sqft | AED 716KAED 715,500 · Jan 2017January 2017 | 35,000 /yr | |
| A160 | Studio | 448 sqft | AED 304KAED 304,000 · Apr 2023April 2023 | ||
| A161 | Studio | 440 sqft | AED 668KAED 667,800 · Sep 2014September 2014 | 46,000 /yr | |
| A162 | Studio | 440 sqft | AED 480KAED 480,000 · Nov 2025November 2025 | 38,000 /yr | |
| A163 | Studio | 487 sqft | AED 791KAED 791,350 · Aug 2015August 2015 | 40,000 /yr | |
| A164 | Studio | 487 sqft | AED 844KAED 843,600 · Feb 2015February 2015 | 40,000 /yr | |
| A165 | Studio | 494 sqft | AED 525KAED 525,000 · Jun 2026June 2026 | ||
| A166 | Studio | 494 sqft | AED 791KAED 791,350 · Oct 2014October 2014 | 43,000 /yr | |
| A167 | Studio | 448 sqft | AED 769KAED 768,550 · Feb 2015February 2015 | 40,000 /yr |
A116, Celestia A in numbers
- Sold twice: first on 5 April 2017 for AED 1,057,000, last on 26 February 2026 for AED 1,200,000 (AED 1,080 per sqft).
- Rented since April 2022 on 6 Ejari contracts, from AED 50,859 to AED 76,000 a year.
- At AED 76,000 a year the gross yield on the 2026 price is 6.3%, before a service charge of about AED 16,000 a year (AED 14.43 per sqft).
- Two-beds in Celestia A sold for AED 1,000,000–1,210,000 in the 12 months to November 2026; the building's median across all types is AED 1,111 per sqft.
Source: Dubai Land Department. Updated 26 February 2026.
Questions about A116, Celestia A
What did unit A116 last sell for?
AED 1,200,000 on 26 February 2026: AED 1,080 per sqft for 1,110 sqft. The unit has 2 registered sales; the first was AED 1,057,000 in April 2017.
What is the rent for unit A116?
AED 76,000 a year on the contract signed on 5 September 2025. The previous contract, from June 2025, was AED 76,000; the unit has been rented since April 2022.
How big is unit A116?
1,110 sqft (103.1 sqm): a two-bedroom apartment on the 1st floor of a 7-storey tower completed in 2019.
What is unit A116 worth today?
The YallaValue estimate is updated daily and free after a one-time verification by WhatsApp, email or Google. Two-beds in Celestia A sold for AED 1,000,000 to 1,210,000 in the last 12 months, around AED 1,062 per sqft.
Selling A116? Put it on the OpenOffers board
Public offers from verified, deposit-backed buyers; a reserve you set; no fee unless it sells, then 1%. Sale agreed in weeks, not months.
Mortgage on A116, Celestia A
Starts from the last sale price (AED 1.2M, 26 February 2026). Switch to today's estimate once you have unlocked it.- Price
- AED 1,200,000
- Deposit, UAE resident (20%)
- AED 240,000
- Deposit, non-resident (40%)
- AED 480,000
- Monthly over 25 years at 3.7%
- AED 4,910
Plus the 4% Dubai Land Department transfer fee and about AED 5,000 of registration and trustee costs. Full mortgage calculator →