
603, Collective 2.0 Tower A
Sold prices and rental history: sold once, by the developer in August 2021, and rented since 2025. Every registered sale and contract is below; today's estimate is free after a one-time verification.
Property timeline for 603, Collective 2.0 Tower A
What is 603 worth today?
Unlock today's estimate, updated daily, with
Verify once to see valuations for every property. Everything else on this page is open.
Source: Dubai Land Department. Updated 25 September 2026.
Key facts
- Type
- 2-bed apartment
- Size
- 731 sqft
- Floor
- 6th of 16
- Parking
- B-89
- Developer
- Dubai Hills Estate
- Completed
- 2022
- Service charge
- AED 2,000 /yr
- Last sold
- AED 1.15M · August 2021
- Building
- Collective 2.0 Tower A
About 603, Collective 2.0 Tower A
603 is a two-bedroom apartment of 731 sqft on the 6th floor of Collective 2.0 Tower A, a 16-storey tower in Dubai Hills Estate completed in 2022 by Dubai Hills Estate. The developer sold it on 24 August 2021 for AED 1,145,888, or AED 1,567 per sqft, in line with the AED 1,581 two-beds in the building were fetching at the time.
It has been rented since 2025 on 2 Ejari contracts. The current contract, signed on 25 September 2026, is AED 114,000 a year: a gross yield of 10.0% on the 2021 price, before the service charge of about AED 2,000 a year.
Sales and rents for 603 over time
603 has sold once; the dashed line is the two-bed median of each year in the building.
Annual rent on each registered contract; the dashed line is the two-bed median of each year in the building.
2-beds in Collective 2.0 Tower A, and where 603 sits
All 110 2-beds →603 last sold in August 2021 at AED 1,567 per sqft, in line with what two-beds in Collective 2.0 Tower A were fetching at the time (AED 1,581). Over the last 12 months two-beds sold for AED 1,300,000 to 2,000,000, around AED 2,153 per sqft, and rent for AED 70,000 to 180,000 a year. 603's AED 114,000 is in the lower half of that range.
| Recent 2-bed sales | Unit no. | Size | Price (AED) | Per sqft | Summary |
|---|---|---|---|---|---|
| 31 Jul 202631 July 2026 | 731 sqft | 1,300,000 | 1,777 | ||
| 8 Jul 20268 July 2026 | 744 sqft | 1,600,000 | 2,149 | ||
| 24 Feb 202624 February 2026 | 756 sqft | 2,000,000 | 2,646 | ||
| 19 Feb 202619 February 2026 | 743 sqft | 1,425,000 | 1,916 |
Collective 2.0 Tower A
Building223 apartments, 1-bed to 2-bed over 16 floors in Dubai Hills Estate, completed in 2022 by Dubai Hills Estate. 14 sold in the last 12 months.
- Typical price per sqft
- AED 2,373 Down 9.0%
- Typical sale
- AED 1.3M
- Typical rent
- AED 88K /yr
- Typical yield
- 6.7%
Other units on the 6th floor
All 223 units in Collective 2.0 Tower A| ValueToday's value | |||||
|---|---|---|---|---|---|
| 601 | 2-bed | 743 sqft | AED 1.43MAED 1,425,000 · Feb 2026February 2026 | 100,000 /yr | |
| 602 | 2-bed | 735 sqft | AED 1.2MAED 1,200,000 · Jul 2022July 2022 | 81,600 /yr | |
| 604 | 1-bed | 488 sqft | AED 740KAED 739,916 · May 2021May 2021 | 72,000 /yr | |
| 605 | 2-bed | 756 sqft | AED 1.2MAED 1,197,888 · Mar 2022March 2022 | 120,000 /yr | |
| 606 | 2-bed | 727 sqft | AED 1.08MAED 1,079,892 · Mar 2021March 2021 | 103,000 /yr | |
| 607 | 1-bed | 474 sqft | AED 800KAED 800,000 · Jun 2022June 2022 | 75,000 /yr | |
| 608 | 1-bed | 480 sqft | AED 1.14MAED 1,135,000 · Apr 2024April 2024 | 53,000 /yr | |
| 609 | 1-bed | 489 sqft | AED 820KAED 820,000 · Nov 2022November 2022 | 75,000 /yr | |
| 610 | 2-bed | 742 sqft | AED 1.12MAED 1,124,888 · Jun 2020June 2020 | ||
| 611 | 1-bed | 479 sqft | AED 783KAED 782,888 · Jun 2021June 2021 | 65,000 /yr | |
| 612 | 1-bed | 486 sqft | AED 783KAED 782,888 · Jun 2021June 2021 | 75,000 /yr | |
| 613 | 1-bed | 492 sqft | AED 1.26MAED 1,260,000 · May 2025May 2025 | 66,240 /yr | |
| 614 | 2-bed | 742 sqft | AED 1.15MAED 1,148,888 · Nov 2021November 2021 | 120,000 /yr | |
| 615 | 2-bed | 741 sqft | AED 1.64MAED 1,635,000 · May 2024May 2024 | 118,000 /yr | |
| 616 | 1-bed | 478 sqft | AED 745KAED 744,888 · Oct 2020October 2020 | 95,000 /yr | |
| 617 | 1-bed | 486 sqft | AED 735KAED 735,041 · May 2021May 2021 |
603, Collective 2.0 Tower A in numbers
- Sold once: by Dubai Hills Estate on 24 August 2021 for AED 1,145,888, or AED 1,567 per sqft.
- Rented since April 2025 on 2 Ejari contracts, from AED 120,000 to AED 114,000 a year.
- At AED 114,000 a year the gross yield on the 2021 price is 10.0%, before a service charge of about AED 2,000 a year (AED 2.70 per sqft).
- Two-beds in Collective 2.0 Tower A sold for AED 1,300,000–2,000,000 in the 12 months to November 2026; the building's median across all types is AED 2,373 per sqft.
Source: Dubai Land Department. Updated 25 September 2026.
Questions about 603, Collective 2.0 Tower A
What did unit 603 last sell for?
AED 1,145,888 on 24 August 2021, sold by the developer: AED 1,567 per sqft for 731 sqft. It is the only registered sale of the unit.
What is the rent for unit 603?
AED 114,000 a year on the contract signed on 25 September 2026. The previous contract, from April 2025, was AED 120,000.
How big is unit 603?
731 sqft (67.9 sqm): a two-bedroom apartment on the 6th floor of a 16-storey tower completed in 2022.
What is unit 603 worth today?
The YallaValue estimate is updated daily and free after a one-time verification by WhatsApp, email or Google. Two-beds in Collective 2.0 Tower A sold for AED 1,300,000 to 2,000,000 in the last 12 months, around AED 2,153 per sqft.
Selling 603? Put it on the OpenOffers board
Public offers from verified, deposit-backed buyers; a reserve you set; no fee unless it sells, then 1%. Sale agreed in weeks, not months.
Mortgage on 603, Collective 2.0 Tower A
Starts from the last sale price (AED 1.15M, 24 August 2021). Switch to today's estimate once you have unlocked it.- Price
- AED 1,145,888
- Deposit, UAE resident (20%)
- AED 229,178
- Deposit, non-resident (40%)
- AED 458,355
- Monthly over 25 years at 3.7%
- AED 4,688
Plus the 4% Dubai Land Department transfer fee and about AED 5,000 of registration and trustee costs. Full mortgage calculator →