
210, Collective 2.0 Tower A
Sold prices and rental history: sold twice, last in October 2024, and rented since 2022. Every registered sale and contract is below; today's estimate is free after a one-time verification.
Property timeline for 210, Collective 2.0 Tower A
What is 210 worth today?
Unlock today's estimate, updated daily, with
Verify once to see valuations for every property. Everything else on this page is open.
Source: Dubai Land Department. Updated 21 October 2024.
Key facts
- Type
- 2-bed apartment
- Size
- 756 sqft
- Floor
- 2nd of 16
- Parking
- GF-22
- Developer
- Dubai Hills Estate
- Completed
- 2022
- Service charge
- AED 2,000 /yr
- Last sold
- AED 1.66M · October 2024
- Building
- Collective 2.0 Tower A
About 210, Collective 2.0 Tower A
210 is a two-bedroom apartment of 756 sqft on the 2nd floor of Collective 2.0 Tower A, a 16-storey tower in Dubai Hills Estate completed in 2022 by Dubai Hills Estate. It last sold on 21 October 2024 for AED 1,660,000, or AED 2,196 per sqft, in line with the AED 2,228 two-beds in the building were fetching at the time.
It has been rented since 2022 on 3 Ejari contracts. The current contract, signed on 15 January 2024, is AED 125,000 a year: a gross yield of 7.5% on the 2024 price, before the service charge of about AED 2,000 a year.
Sales and rents for 210 over time
210 has sold twice; the dashed line is the two-bed median of each year in the building.
Annual rent on each registered contract; the dashed line is the two-bed median of each year in the building.
2-beds in Collective 2.0 Tower A, and where 210 sits
All 110 2-beds →210 last sold in October 2024 at AED 2,196 per sqft, in line with what two-beds in Collective 2.0 Tower A were fetching at the time (AED 2,228). Over the last 12 months two-beds sold for AED 1,300,000 to 2,000,000, around AED 2,153 per sqft, and rent for AED 70,000 to 180,000 a year. 210's AED 125,000 is in the upper half of that range.
| Recent 2-bed sales | Unit no. | Size | Price (AED) | Per sqft | Summary |
|---|---|---|---|---|---|
| 31 Jul 202631 July 2026 | 731 sqft | 1,300,000 | 1,777 | ||
| 8 Jul 20268 July 2026 | 744 sqft | 1,600,000 | 2,149 | ||
| 24 Feb 202624 February 2026 | 756 sqft | 2,000,000 | 2,646 | ||
| 19 Feb 202619 February 2026 | 743 sqft | 1,425,000 | 1,916 |
Collective 2.0 Tower A
Building223 apartments, 1-bed to 2-bed over 16 floors in Dubai Hills Estate, completed in 2022 by Dubai Hills Estate. 14 sold in the last 12 months.
- Typical price per sqft
- AED 2,373 Down 9.0%
- Typical sale
- AED 1.3M
- Typical rent
- AED 88K /yr
- Typical yield
- 6.7%
Other units on the 2nd floor
All 223 units in Collective 2.0 Tower A| ValueToday's value | |||||
|---|---|---|---|---|---|
| 201 | 2-bed | 743 sqft | AED 1.4MAED 1,400,000 · Mar 2023March 2023 | 180,000 /yr | |
| 202 | 2-bed | 735 sqft | AED 1.16MAED 1,158,888 · Aug 2022August 2022 | ||
| 203 | 2-bed | 731 sqft | AED 1.16MAED 1,160,888 · Apr 2022April 2022 | 100,000 /yr | |
| 204 | 1-bed | 488 sqft | AED 930KAED 930,000 · May 2023May 2023 | 75,000 /yr | |
| 205 | 2-bed | 756 sqft | AED 1.55MAED 1,550,000 · Jan 2024January 2024 | 128,000 /yr | |
| 206 | 2-bed | 744 sqft | AED 1.25MAED 1,250,000 · May 2023May 2023 | 108,000 /yr | |
| 207 | 1-bed | 474 sqft | AED 1.15MAED 1,150,000 · Jan 2025January 2025 | 81,000 /yr | |
| 208 | 1-bed | 480 sqft | AED 1.14MAED 1,140,000 · Feb 2025February 2025 | 85,000 /yr | |
| 209 | 1-bed | 489 sqft | AED 825KAED 825,000 · Dec 2022December 2022 | 60,450 /yr | |
| 211 | 1-bed | 479 sqft | AED 1.15MAED 1,150,000 · Feb 2025February 2025 | 78,750 /yr | |
| 212 | 1-bed | 486 sqft | AED 757KAED 757,466 · May 2021May 2021 | ||
| 213 | 1-bed | 486 sqft | AED 757KAED 757,466 · May 2021May 2021 | ||
| 214 | 2-bed | 756 sqft | AED 1.53MAED 1,530,000 · Jun 2023June 2023 | 72,000 /yr | |
| 215 | 2-bed | 741 sqft | AED 1.16MAED 1,164,888 · Mar 2022March 2022 | 105,600 /yr | |
| 216 | 1-bed | 478 sqft | AED 1.17MAED 1,170,000 · May 2024May 2024 | 95,000 /yr | |
| 217 | 1-bed | 486 sqft | AED 740KAED 740,000 · Jun 2022June 2022 | 65,000 /yr |
210, Collective 2.0 Tower A in numbers
- Sold twice: first on 13 April 2021 for AED 1,197,888, last on 21 October 2024 for AED 1,660,000 (AED 2,196 per sqft).
- Rented since July 2022 on 3 Ejari contracts, from AED 91,000 to AED 125,000 a year.
- At AED 125,000 a year the gross yield on the 2024 price is 7.5%, before a service charge of about AED 2,000 a year (AED 2.70 per sqft).
- Two-beds in Collective 2.0 Tower A sold for AED 1,300,000–2,000,000 in the 12 months to November 2026; the building's median across all types is AED 2,373 per sqft.
Source: Dubai Land Department. Updated 21 October 2024.
Questions about 210, Collective 2.0 Tower A
What did unit 210 last sell for?
AED 1,660,000 on 21 October 2024: AED 2,196 per sqft for 756 sqft. The unit has 2 registered sales; the first was AED 1,197,888 in April 2021.
What is the rent for unit 210?
AED 125,000 a year on the contract signed on 15 January 2024. The previous contract, from September 2023, was AED 125,000; the unit has been rented since July 2022.
How big is unit 210?
756 sqft (70.2 sqm): a two-bedroom apartment on the 2nd floor of a 16-storey tower completed in 2022.
What is unit 210 worth today?
The YallaValue estimate is updated daily and free after a one-time verification by WhatsApp, email or Google. Two-beds in Collective 2.0 Tower A sold for AED 1,300,000 to 2,000,000 in the last 12 months, around AED 2,153 per sqft.
Selling 210? Put it on the OpenOffers board
Public offers from verified, deposit-backed buyers; a reserve you set; no fee unless it sells, then 1%. Sale agreed in weeks, not months.
Mortgage on 210, Collective 2.0 Tower A
Starts from the last sale price (AED 1.66M, 21 October 2024). Switch to today's estimate once you have unlocked it.- Price
- AED 1,660,000
- Deposit, UAE resident (20%)
- AED 332,000
- Deposit, non-resident (40%)
- AED 664,000
- Monthly over 25 years at 3.7%
- AED 6,792
Plus the 4% Dubai Land Department transfer fee and about AED 5,000 of registration and trustee costs. Full mortgage calculator →